R-Zero
Deployment also cut excess airflow 72% during low-occupancy periods at the Bay Area site.
Results verified against a pre-project baseline using international performance measurement and verification protocol (IPMVP) methodology.
Hines senior managing director Jonathan Pearce cited direct net operating income (NOI) lift with no infrastructure disruption.
Commercial Observer
↑ swipe up for analysis
Rentify
Total funding reaches $2.5m including a $500,000 pre-seed closed in 2025.
Rentify analysis finds landlords leave 8–14% of annual rental income unrealised due to pricing gaps and payment leakage.
Earn AI is natively built in Arabic and designed for Gulf Cooperation Council (GCC) tenancy structures.
Wamda
↑ swipe up for analysis
Core42
Lake Mariner expansion adds Nvidia infrastructure alongside the site's existing AMD-powered systems.
Core42 currently operates 25 MW across 10 sites globally; the 100 MW target is for full-year 2026.
Expansion funded by $550m in HSBC trade finance facilities, including a $310m tranche announced in May.
AGBI
↑ swipe up for analysis